One of the most frequent questions our customers ask is “What is the breakout of budget for my kitchen remodel?” A popular follow-up question is “Is there any places I can scale back to reduce the budget?”
The following article details where a typical Northern Virginia kitchen remodel budget is allocated and areas where a homeowner can scale back the scope to reduce the overall cost of the remodel.
Cabinets and labor take the biggest shares of a kitchen remodel budget: nearly 30% for cabinets and about 25% for labor, according to HomeAdvisor’s survey-based cost guide. Other published cost guides put cabinets anywhere from 25% to 40%. Appliances, countertops, flooring, and lighting make up most of the rest. Knowing where each dollar goes helps you decide what to upgrade, what to scale back, and how to compare proposals, whether your kitchen is in Fairfax, Arlington, Alexandria, or Woodbridge.
What are the biggest costs in a kitchen remodel?
Cabinets are the biggest single cost, labor is second, and electrical work is a smaller but steady line. The table combines national sources: four cost guides (HomeAdvisor, Angi, HomeGuide, and Fixr) for each category’s share of the budget, and Houzz for how often homeowners actually upgrade each item.

Each range shows the lowest and highest share published by HomeAdvisor, Angi, HomeGuide, and Fixr. HomeAdvisor says it surveyed more than 10,000 customers (2025 data, updated June 17, 2026) and puts cabinets at nearly 30%, labor at 25%, electrical at about 5%, and design at about 3%. Angi, HomeGuide, and Fixr do not explain how their percentages were calculated, and the guides disagree most on appliances (6% to 15%), flooring (7% to 18%), and cabinets (25% to 40%). *Angi (9%) and HomeGuide (10%) combine countertops and backsplash; Fixr lists countertops at 14% and backsplash at 4%. Fixr states labor at 50% to 60% of total cost and leaves it out of its percentage table, so it is not in the labor range. Houzz fielded its survey in July 2025 among 1,780 homeowners who had completed, or were planning, a kitchen remodel; its report lists cabinet upgrades at 95% on page 10 (68% replace all plus 27% some) and 84% on page 27, and this article uses page 10. All sources are national, not Northern Virginia data.
Why are cabinets the biggest cost?
HomeAdvisor says cabinets take nearly 30% of the typical budget. A kitchen needs a lot of them, and prices vary widely by type: HomeAdvisor puts stock cabinets at $100 to $300 per linear foot and custom cabinets at $500 to $1,200 or more.
Houzz’s 2026 Kitchen Trends Study found that 68% of renovating homeowners replace all of their cabinets, 27% upgrade some, and 5% keep them. That middle group is worth noticing: upgrading only part of your cabinets is one of the few ways to reduce the biggest line in your budget. Features such as a kitchen island, custom cabinetry with smart storage, or added pantry cabinets typically add to the cabinet count, so they add to this line too.
Which finishes effect the budget the most?
Countertops, flooring, and backsplash are where your material choices change the total the most, because each comes in a wide range of materials. Houzz found that 91% of renovating homeowners upgrade countertops, 85% upgrade the backsplash, 78% upgrade lighting fixtures, and 65% upgrade flooring.
HomeAdvisor’s installed ranges show the spread. Countertop installation runs $1,870 to $4,400, and high-end materials can push countertops past $10,000. Flooring installation runs $1,000 to $4,000, and a tiled backsplash runs $500 to $1,700 installed. Our kitchen remodeling page lists the upgrades Veteran Built Homes clients choose most often: quartz or natural stone countertops, energy-efficient appliances, under-cabinet and pendant lighting, hardwood or luxury vinyl plank flooring, and kitchen islands.
What costs more when you change the layout?
Moving things costs more than replacing them, because each move adds trade work on top of the new materials. HomeAdvisor lists moving a gas line at $375 to $750 and relocating an outlet or fixture at an average of $220, and those are just two examples of the small items that add up when plumbing, gas, or electrical lines shift.
A like-for-like layout keeps sinks, ranges, and outlets where they are, so more of your budget goes into cabinets, counters, and finishes you can see and use. If your layout works, that is usually the more efficient path. If it does not, a design consultation before you set a budget helps you decide which moves are worth paying for.
Where can you scale back without hurting the result?
The most practical savings come from partial upgrades and from picking one or two statement materials instead of upgrading every line. Three levers show up in the data:
- Upgrade some cabinets, not all. 27% of Houzz respondents upgrade cabinets partially instead of replacing them all.
- Replace some appliances. 33% of Houzz respondents replace only some appliances, while 51% replace them all.
- Keep the layout. Every relocated gas line, outlet, or fixture adds to the labor and materials lines.
Choose where to spend by deciding what you touch every day, such as the cabinets and counters, and where finishes matter less.
About Veteran Built Homes
Veteran Built Homes is a Service-Disabled Veteran-Owned Small Business (SDVOSB) founded in 2017 by two retired Navy veterans. We hold a Virginia Class A Contractor license (#2705178294) and a Maryland MHIC license (#138740), and we have completed more than 2,500 projects across Northern Virginia, with more than 185 five-star Google reviews. Here is how a kitchen project works with us:
- A sales consultant visits your home to measure and discuss your goals, layout, and finishes.
- You receive a detailed scope of work and a proposal, and you can request revisions.
- After approval, your project manager invoices a 30% deposit and proposes a start date.
- A dedicated project manager is your main contact, our crew arrives on time, and we clean up daily.
- We finish with a final walkthrough together.
For Northern Virginia price ranges, see our kitchen remodel cost guide and cost estimator.
Frequently asked questions
What is the biggest cost in a kitchen remodel?
Cabinets are the biggest cost, at nearly 30% of a typical budget according to HomeAdvisor. Labor is second at about 25%.
How much of a kitchen remodel budget goes to labor?
About 25%, according to HomeAdvisor’s survey-based cost guide; Angi and HomeGuide put it at 18% and 15%. Houzz found that 87% of renovating homeowners hire at least one professional, most often a general contractor (48%), a building specialist (42%), or a cabinetmaker (34%).
How long does a kitchen remodel take?
Most Veteran Built Homes kitchen remodels are completed within four to eight weeks once construction begins. The timeline depends on the scope of your project, and that range does not include the planning phase that comes first. During planning, we give you a detailed project schedule so you know what to expect before work starts.
Do most homeowners replace all of their kitchen cabinets?
Most do. Houzz’s 2026 Kitchen Trends Study found that 68% replace all of their cabinets, 27% upgrade some, and 5% keep them.
Which parts of a kitchen remodel can I scale back?
Partial upgrades are the most common way. Houzz found that 27% of homeowners upgrade only some cabinets and 33% replace only some appliances. Keeping your layout in place also avoids the added labor and materials that come with moving gas, plumbing, and electrical lines.
What should a kitchen remodeling proposal itemize?
It should name your cabinets, countertops, appliances, flooring, backsplash, lighting, and plumbing fixtures so you can compare bids line by line. At Veteran Built Homes, your consultant prepares a detailed scope of work after measuring your kitchen, and you can request revisions.
Ready to plan your kitchen?
Veteran Built Homes offers a free in-home consultation and a detailed estimate with no obligation. As a licensed and insured, Service-Disabled Veteran-Owned Small Business, we serve Fairfax, Prince William, Loudoun, and Stafford counties, plus Alexandria and Arlington. Request a quote or call (571) 660-1015.
Built With Quality. Built With Pride.
Sources
- HomeAdvisor, [How Much Does a Kitchen Remodel Cost? [2025 Data]](https://www.homeadvisor.com/cost/kitchens/remodel-a-kitchen/), updated June 17, 2026: budget shares for cabinets, labor, electrical, and design; component price ranges. HomeAdvisor states that it surveyed more than 10,000 customers about their project costs.
- Houzz, 2026 U.S. Houzz Kitchen Trends Study, January 13, 2026, and the full report (PDF): how often homeowners replace or upgrade cabinets (p. 10), countertops, backsplash, lighting, flooring, and appliances (p. 27); professionals hired. Survey fielded July 6 to 30, 2025; 1,780 homeowners.
- Angi, How Much Does a Small Kitchen Remodel Cost?, updated August 3, 2026: category shares of budget for a small kitchen. Angi does not state how the shares were calculated.
- HomeGuide, Kitchen Remodel Cost, December 31, 2025: approximate category shares of budget. HomeGuide says it tracks millions of contractor estimates but does not explain how the shares were derived.
- Fixr, How Much Does a Kitchen Remodel Cost?, updated January 27, 2026: category shares of budget. Fixr does not state its sample size or how the shares were calculated.
- Veteran Built Homes, Kitchen Remodeling and Kitchen Remodeling FAQs: upgrade options listed on the page; typical construction timeline. Accessed October 12, 2026.
- Veteran Built Homes, Working With Us: project process, 30% deposit, project manager, daily cleanup. Accessed October 12, 2026.
HomeAdvisor, Angi, HomeGuide, Fixr, and Houzz are national sources, not Northern Virginia data. Dollar ranges are HomeAdvisor’s national installed costs.